|
Wickenburg (SR
89) to Santa Maria River
Initial
Location/Design Concept Report, February 2004
Main Body
Executive
Summary
Section 1
- Introduction
Section 2
- Traffic and Accident Data
Section 3 - AASHTO Controlling Design Criteria
Section 4
- Design Concept Alternatives
Section 5 -
Major Design Features
Section
6 - Itemized Cost Estimate
Section 7 -
Access Management Plan
Section 8 - Implementation Plan
Section 9 -
Environmental Impact Mitigation Measures
Appendices
A - AASHTO Analysis of Existing Roadway Alignment
B - Detailed Cost
Estimates
C - Typical Sections
D - Plan and Profile Sheets - Preferred Alternative
E - Access Management - Full Access Control Concepts
F - Summary of
Hydrology and Required Drainage Structures
|