US 93: Wickenburg to Santa Maria River

Location/Design Concept Study and Environmental Studies

WB01403_.gif (2340 bytes)

Home

SR 89 to Wickenburg Interim Bypass

Wickenburg   (SR 89) to Santa Maria River

Interim Improvement Project

Wickenburg Bypass

Related Studies

Study Team

Feedback

What's New

adot2000.jpg (57245 bytes)

wpe14.jpg (3130 bytes)

Wickenburg (SR 89) to Santa Maria River

Initial Location/Design Concept Report, February 2004

Main Body

Executive Summary

Section 1 - Introduction

Section 2 - Traffic and Accident Data

Section 3 - AASHTO Controlling Design Criteria

Section 4 - Design Concept Alternatives

Section 5 - Major Design Features

Section 6 - Itemized Cost Estimate

Section 7 - Access Management Plan

Section 8 - Implementation Plan

Section 9 - Environmental Impact Mitigation Measures

Appendices

A - AASHTO Analysis of Existing Roadway Alignment

B - Detailed Cost Estimates

C - Typical Sections

D - Plan and Profile Sheets - Preferred Alternative

E - Access Management - Full Access Control Concepts

F - Summary of Hydrology and Required Drainage Structures

 

       

This page updated: October 28, 2004.