|
Wickenburg (SR
89) to Santa Maria River
Final
Location/Design Concept Report, September 2006
Main Body
Executive
Summary
Section 1
- Introduction
Section 2
- Traffic and Accident Data
Section 3 - AASHTO Controlling Design Criteria
Section 4
- Design Concept Alternatives
Section 5 -
Major Design Features
Section
6 - Itemized Cost Estimate
Section 7 -
Access Management Plan
Section 8 - Implementation Plan
Section 9 -
Environmental Impact Mitigation Measures
Appendices
A - Design
Exception
B - AASHTO
Analysis of Existing Roadway Alignment (Horiz./Vert.)
C -
Detailed Cost Estimates
D -
Typical Sections
E - Plan and
Profile Sheets - Preferred Alternatives
F - Access
Management - Full Access Control Concepts
G - Summary -
Hydrology and Required Drainage Structures
|