|
US 93: Wickenburg to Santa Maria River Location/Design Concept Study and Environmental Studies
|
|
SR 89 to Wickenburg Interim Bypass |
Interim Improvement Project Final Design Concept Report, October 2003 Chapter 1 - IntroductionChapter 2 - Traffic and Accident Data Chapter 3 - AASHTO Controlling Design Criteria Chapter 4 - Design Concept Alternatives (part 1) (part 2) Chapter 5 - Major Design Features Chapter 6 - Itemized Cost Estimate Appendix B - Plan Profile Sheets - Preferred Alternative Appendix C - Design Exception Letter
|
|