Location and Date: Morristown Elementary School
December 13, 2000
Subject: US 93, Wickenburg to Santa Maria River
Location/Design Concept Study
TRACS No. H 4871 01L
Summary:
A Public Information Meeting was held on December 13, 2000, at the Morristown Elementary School, 25950 West Rockaway Hills Drive, Morristown, Arizona. The purpose of the meeting was to review progress on the study to improve US 93 from the intersection with State Route (SR) 74 south of Wickenburg to the Santa Maria River. The information presented was similar to the previous public meeting held in Wickenburg on August 22, 2000, regarding the proposed Wickenburg bypass. In addition, issues specific to the Morristown area were discussed, including the potential connection of a Wickenburg bypass to US 93/US 60 near the junction with SR 74.
Notice of the 7:00 p.m. meeting was provided in the Wickenburg Sun and the Arizona Republic. The meeting notice included a brief description of the study corridor and the purpose of the Location/Design Concept Study. It also listed persons to contact for more information or to comment on the study.
Study Team members were available before and after the meeting to informally discuss the project. Exhibits were utilized to facilitate discussion, including a map of the entire study corridor with an enlargement of the possible bypass corridors around Wickenburg and a flow chart depicting the study process.
An informational packet from the August 22, 2000, meeting, as well as copies of comment sheets and a recent newsletter, were passed out at the entrance to the meeting. The handout provided information on several items, including the purpose of the meeting, a description of the study, the progress of the study to date, and upcoming events. Reduced-scale copies of the meeting exhibits were attached. The meeting participants were encouraged to submit comments on the comment sheet.
Fifty-three people attended the meeting. The presentation began at 7:15 p.m. with an introduction of the Study Team, followed by descriptions of the study process and the proposed project. The bypass alternatives were then discussed, including the need for the project, evaluation criteria, and the bypass corridor selection process. The alternatives for widening US 93 north of Wickenburg to the Santa Maria River were also presented.
Two preliminary concepts for connecting the bypass to US 60 and SR 74 in the Morristown area were discussed. The presentation showed implementation of three stages of construction: first, connecting a two-lane bypass route to US 60 with an at-grade intersection; second, a diamond interchange; and third, a systems interchange that would be necessary if both the bypass and SR 74 became access-controlled, multi-lane divided roadways.
After the presentation, an open question and answer session was held. The Study Teams responses are shown in italics.
Summary of Question and Answer Session
The meeting was adjourned at 9:30 p.m.
Signed: Laura N. Gerbis, Environmental Planner 12/27/00